Beaverhut Bridge Installation
Client: Trans Mountain Expansion Project
Owner: Ministry of Forests
Location: Kamloops, BC
Date: July – September 2024
Details: For this Ministry of Forests project, CEC replaced a culvert with a 21m bridge on the Beaverhut FSR, north of Kamloops. The bridge consisted of a steel girder superstructure with composite precast deck panels, and sat on 8 steel pipe piles. The project also included the development, hauling and placement of riprap, as well as the disposal of the existing 1200mm culvert and completion of all the new approaching road works.