Ryan Beers

RYAN BEERS

CALL 250 319 0838 FOR A QUOTE

Clapperton Creek Bridge

This bridge was a project for KLL Construction and the Ministry of Transportation and Infrastructure just north of Merritt, BC. We helped KLL replace the bridge on Mill Creek Road with a precast concrete stringer bridge on steel pipe foundations and cast-in-place abutments. For the pile driving for this project, we fabricated our leads and designed and fabricated our drop hammer as well! The drop hammer is truly a work of art as we designed it to have a two-part configuration which can be used as a 6,450lb hammer or a 12,700lb hammer. The hammer cushion is made out of Purple Heart hardwood intricately pieced together like a jigsaw puzzle. For this job, we installed the pipe piles, formed the abutments, erected and installed the girders and helped with all the finishing touches to get this new bridge up and running. 

Got a Project? Let’s Work Together…

Contact Us

1400 Chief Louis Way, PO Box 26035 Valleyview PO, Kamloops, BC, V2C 0A9

250 319 0838

briar@cuttingedgegroup.ca

ryan@cuttingedgegroup.ca