Your Bridge Between Projects
At CEC, bridges are our middle name. With a long line of experience working with the Ministry of Transportation and Infrastructure and BC’s road maintenance contractors, CEC has been a prominent bridge contractor all over BC for new builds, rehabilitations, demolitions, and replacements. Equipped with mobile cranes of all capacities, pile driving equipment, mobile welding skids, and general construction tools/equipment, CEC can self-perform all bridge building and reconstruction operations. Our crew of CWB welders, bridgemen, and operators are led by an industry-known bridge expert, and with a team like that, CEC can solve all bridge-related problems.
Our bridge expertise includes:
- Installing steel composite, Bailey and Acrow, and wood truss bridges
- Erecting precast girders and stringers
- Designing and implementing temporary bridge structures
- Installing pedestrian bridges
- Pile cap replacements
- Foundation rehab and pier stabilizing
- Superstructure and substructure steel and timber repairs
- Demolitions and decommissioning