THE DETAILS
CEC returned to the RW Bruhn Bridge in Sicamous in February of 2022 to replace some more blue railing posts, just as we did in 2019! This time around, our crew replaced a total of seven posts and six galvanized railing panels. In addition to prefabricating and installing the steel, we did concrete repairs on the sidewalk and around existing posts.





