Summerland Slide
Client: AIM Roads
Owner: Ministry of Transportation and Transit
Location: Summerland, BC
Date: May – November 2024
Details: To support the efforts to stabilize the unsafe rock slope, CEC assisted by supplying crew and equipment and ingenuity in the installation of 24m long x 140mm diameter rock anchors. This was followed by custom formwork and cast-in-place concrete for in-situ, rockface grade beams for “mass concrete” (per MOTT spec) pouring, while managing high summer temperatures.